65 GUCHEN - MODIFICATION DE L’EVACUATION D’ENERGIE HTA
- Buyer
- HYDROSTADIUM, Annecy
- Country
- France
- Estimated value
- —
- Deadline
- 29 Oct 2026, 12:00 CET
- Published
- 5 Oct 2026
- Procedure
- Negotiated with prior call
- Contract type
- Supplies
Categories
- 31200000 Electricity distribution and control apparatus
- 71323100 Electrical power systems design services
- 31321210 Low-voltage cable
- 31682300 Medium-voltage equipment
- 45315500 Medium-voltage installation work
- 45317200 Electrical installation work of transformers
- 51111300 Installation services of transformers
- 51112000 Installation services of electricity distribution and control equipment
- 71335000 Engineering studies
- 31171000 Liquid dielectric transformers
- 31700000 Electronic, electromechanical and electrotechnical supplies
From the original notice
L’opération consiste au basculement de l’évacuation d’énergie de l’usine de GUCHEN du réseau de transport en HTB – RTE au réseau de distribution en HTA – ENEDIS. Pour ce faire, 3 lots sont constitués : - Lot 1 - intégration et fournitures matériels (objet du présent marché), - Lot 2 - génie civil, - Lot 3 – Evacuation et revalorisation du transformateur existant, Le périmètre succinct du présent lot (Lot 1) comprend les opérations de : - Etudes, fourniture et installation d’un nouveau transformateur 7 MVA 10/20 kV et ses accessoires, - Etudes, fourniture et installation d’un bac de rétention…