CPS and UPS systems for SFRS and NUSTAR
- Buyer
- FAIR - Facility for Antiproton and Ion Research in Europe GmbH, Darmstadt
- Country
- Germany
- Estimated value
- —
- Deadline
- 29 Oct 2026, 12:00 CET
- Published
- 29 Sept 2026
- Procedure
- Negotiated with prior call
- Contract type
- Supplies
Categories
- 31154000 Uninterruptible power supplies
From the original notice
The required CPS and UPS modules, as well as the external battery modules, serve as power supply systems. They are installed in 19"-racks. These racks are located along the beamline of the Super-FRS (Superconducting Fragment Separator), either directly at the beamline or in niches. The Super-FRS is part of the FAIR accelerator facility (Facility for Antiproton and Ion Research), which is currently under construction in Darmstadt, Germany. At their operating location, the systems are therefore exposed to increased radiation levels and are difficult to access. Since the components connected to…
Only the original notice and the buyer's documents are legally binding.